Skip to content
AHMInternational

Commercial guide

Running a corporate uniform program.

What happens after the first order: size breakdowns, wearer allocations, stock and reorder points, replacements, new starters and keeping colour and fit the same for years.

In short

A corporate uniform program is a supply chain, not a single order. It needs a size breakdown that matches the workforce, an allocation per wearer, stock and reorder points that cover the manufacturer's lead time, a plan for replacements and new starters, and a locked specification so every reorder matches the first delivery. Most problems come from running out of sizes, or from a reorder that does not quite match.

7 min read

Written by the AHM International product development team

Updated November 2026. Every worked figure is checked by automated tests.

The parts of a program

Specification lock
The approved sample, colour standard and specification kept on file for every reorder.
Size breakdown
From a size survey or past orders, not a standard curve.
Allocation
How many of each garment each role receives, and how often it is replaced.
Stock and reorder point
Enough stock to cover demand during the manufacturer's lead time, plus a buffer.
New starters and leavers
A process for issuing and recovering garments.

Why reorders drift

A reorder can differ from the first delivery if the fabric comes from a different lot or mill, the colour is matched to the last delivery instead of the standard, or a trim is substituted. Matching every lot to the original approved standard, and recording fabric and trim sources, keeps a program consistent for years.

Run the numbers

Before a reorder, check stock by size against the size breakdown. Sizes rarely run out evenly; reordering only the totals leaves some sizes short and others overstocked.

Work the numbers

Try it on your own fabric.

Related questions

Also asked.

Run a size survey or use past orders to build a size breakdown, then add spares for the most common sizes.

It depends on the garment, the job and the laundering. Set a replacement cycle per garment and review it against wear.

Keep the approved sample and colour standard, match every lot to the original standard, and record fabric and trim sources.

PUT IT INTO PRACTICE.

Send one specification and we will apply exactly this thinking to your style. Construction, materials and commercial FOB costing.

Request Quote